DEEN
044 860 37 91Request a quote
Flat renovation in Switzerland

Renovate and remodel your flat. In weeks, not months.

Whether you want to renovate your flat completely, remodel it before moving in or just renew the kitchen and bathroom: we plan, obtain comparable quotes and coordinate all tradespeople. Most of our flat renovations were finished in six weeks.

  • Site visit and advice by architects
  • Cost calculator by number of rooms
  • One contact person for all tradespeople
Renovated flat with open kitchen, counter and parquet flooring in the living area Flat renovation Kilchberg · 2 months
5.0★★★★★from 31 Google reviews
What we renovate

Renovating a flat, room by room

From a refresh to a complete renovation. We coordinate all work so that your flat is habitable again as quickly as possible.

Renovated living area in a flat in Lucerne

Floors, walls & ceilings

New parquet or tiles, fresh walls, modern ceilings with lighting.

New kitchen in an owner-occupied flat in Bremgarten

Kitchen

New kitchen with appliances from strong brands, often installed within a week.

New bathroom in a flat in Herrliberg

Bathroom & shower

From a bathroom renovation to renewing all wet rooms.

Flat in Dübendorf after the renovation

Layout

Open up rooms, combine rooms or divide them differently.

Completely renovated flat in Uitikon

Electrics & lighting

New wiring, sockets, lighting and smart home.

Flat in Basel renovated before moving in

Complete renovation

Everything from a single source, ideal between purchase and moving in.

Costs

How much does it cost to renovate a flat?

Choose the size of your flat and what you want to renew. The calculator shows a first ballpark figure; you get a reliable quote after the site visit.

Flat renovation cost calculator

Rooms
What would you like to renew?
Finish standard
Ballpark incl. planning, construction management & VATCHF 79'000 – 162'000
Request an exact quote →

As a rough guide, standard finish, including planning, construction management and VAT:

FlatScopeCHF total
3.5 rooms, 85 m²Refresh: floors, walls & ceilings17'000 – 33'000
2.5 rooms, 65 m²Complete: floors, walls, kitchen, bathroom75'000 – 154'000
3.5 rooms, 85 m²Complete: floors, walls, kitchen, bathroom79'000 – 162'000
4.5 rooms, 110 m²Complete with 2 bathrooms117'000 – 239'000
1
Kitchen and bathroomThey usually account for the largest share of costs. The finish standard is decisive here.
2
Condition of the pipesIf water and electrical lines are old, it pays to renew them as part of the renovation.
3
LayoutMoving walls costs more if pipes have to be relocated or load-bearing parts assessed.
4
All at onceA comprehensive renovation is cheaper than one room a year, because strip-out, protection and coordination are only needed once.
Duration

How long does a flat renovation take?

Depending on the scope, one week to two months. This is how long our flat projects took.

Kitchen modernisation, BremgartenOwner-occupied flat
1 wk
Bathroom and kitchen renovation, EmmenOwner-occupied flat
4 wks
Renovation of all bathrooms, HerrlibergFlat
4 wks
Flat renovation, LucerneFlat
6 wks
Before moving in: flat renovation, BaselOwner-occupied flat
6 wks
Flat renovation, KilchbergFlat
2 mo.
Before moving in

Bought a flat? Renovate before you move in.

The time between key handover and moving in is ideal for a renovation: no dust in daily life, no furniture in the way, and you move into a finished flat. That is exactly how we renovated in Basel and Uitikon, in six weeks each.

Plan a renovation before moving in →
8 wks before
Site visit & conceptWe view the flat, often before you buy, and estimate the costs.
4 wks before
Quotes & orderingYou choose tradespeople and materials. Kitchen and tiles are ordered.
Week 0
Key handoverStrip-out starts the next day.
Weeks 1–5
RenovationPipes, bathroom, kitchen, floors and walls in a coordinated order.
Week 6
Handover & moving inJoint handover, cleaning, then you move in.
What is allowed?

Owner-occupied or rented flat: what to bear in mind

Before you renovate, it is worth looking at the ownership situation. We clarify this together with you before the start.

Condominium ownership (Stockwerkeigentum)

Owner-occupied flat

  • Renewing floors, walls, kitchen and bathroom within your flat
  • Moving non-load-bearing walls
  • Load-bearing walls, risers, windows and façade usually belong to the owners' association. Their approval is required in line with the regulations.
  • Plan noisy work according to the house rules and inform the neighbours
Rented

Rented flat

  • Small refreshes by agreement
  • Renewals and alterations require the landlord's written consent
  • Clarify beforehand whether changes must be reversed when you move out or will be compensated
Buying

Buying and renovating a flat

  • Have the renovation costs estimated before buying
  • Check the owners' association regulations and minutes, e.g. on planned refurbishments
  • Plan the renovation between key handover and moving in
  • Take the renewal fund and upcoming joint projects into account in your budget
Process

Flat renovation from a single source

You have one contact person. We coordinate all tradespeople from our vetted network.

Request a quote →
1

Site visit

We inspect the flat on site, record your wishes and detect hidden defects early.

You get: assessment & cost range
2

Concept & quotes

An architect plans the renovation. You receive comparable quotes and choose.

You get: plans & quotes
3

Planning & scheduling

We define materials and sequence and clarify permits and house rules.

You get: binding schedule
4

Renovation & handover

Our construction managers coordinate all trades through to handover and defect management.

You get: finished flat
PaintersTilersPlumbersElectriciansJoiners & kitchen fittersFloor layersPlasterers & drywallersBricklayersInterior design
Your partner for flat renovation

Flat renovation in Zurich, Winterthur, Basel, Lucerne and Bern

Five locations, advisers from your region and vetted local tradespeople.

One contact personYou do not have to look for tradespeople or coordinate appointments.
Quickly habitableA coordinated sequence so that the flat is a building site for as short a time as possible.
Comparable quotesObtained digitally and clearly compared side by side.
Full transparencyPlans, quotes, budget and schedule in the renovation cockpit.
Experience with condominiumsWe coordinate with the management company and the owners' association.
Part of HGCThe Swiss building materials cooperative is our strategic partner.
★★★★★

«Umbau manager is friendly, responsive and easy to communicate.»

  • Complete renovation of a flat
Google review · Flat renovation
Frequently asked questions

Questions about flat renovation

Christian Vogt
Reviewed by Christian VogtArchitect BA ZFH · Updated October 2026
How much does it cost to renovate a 3-room flat?

That depends on the scope. If only floors and walls are renewed, it is considerably cheaper than a complete renovation with a new kitchen and new bathroom. Our cost calculator shows a ballpark figure by number of rooms and measures.

How long does a flat renovation take?

A new kitchen is often installed within a week, bathroom and kitchen together in around four weeks. Complete flat renovations in our projects usually took six weeks to two months.

Do I need a permit for a flat renovation?

A typical interior flat renovation rarely needs a building permit. A permit may be required for changes to the façade or load-bearing parts, or for a heat pump that uses groundwater. We clarify this for you.

May I remove walls in my owner-occupied flat?

You can usually alter non-load-bearing walls within your flat. Load-bearing walls, risers, windows and façade are usually common property in a condominium. Their alteration requires the approval of the owners' association in line with the regulations.

May I renovate a rented flat?

As a tenant, you need the landlord's written consent for renewals and alterations. Also clarify beforehand what happens to the changes when you move out.

Can I live in the flat during the renovation?

For smaller works, often yes. If the kitchen and bathroom are worked on at the same time, the flat is hardly habitable for a few weeks. Renovating before moving in is ideal.

How do I get a quote for my flat renovation?

After a free site visit you receive a concept and comparable quotes from vetted tradespeople in your region. Request a quote here.

Guide

Guide to flat renovation

In-depth information for your planning. Click on a chapter to open it.

In what order do you renovate a flat?

The right order prevents fresh surfaces from being damaged again. This has proven itself:

  1. Planning and ordering: kitchens, tiles and sanitary fittings have delivery times. Order early.
  2. Strip-out: remove the old kitchen, bathroom, floors and wall coverings.
  3. Pipes and wiring: renew plumbing and electrical installations while walls and floors are open.
  4. Walls and ceilings: plastering and drywall work, putting up new walls.
  5. Bathroom and tiles: waterproofing, tiling, sanitary fittings.
  6. Painting: before the floors, so that they stay protected.
  7. Floors and kitchen: lay floor coverings, install the kitchen.
  8. Finishing: lights, sockets, handover and cleaning.
Renovating a period flat: what to look out for?

Period flats have a lot of charm, but also typical pitfalls. Before renovating, check in particular:

  • Pipes and wiring: old water and electrical lines are often at the end of their service life.
  • Hazardous materials: buildings constructed before 1990 may contain asbestos, for example in floor coverings or adhesives.
  • Floors: old parquet floors can often be sanded and preserved.
  • Sound insulation: with new floor coverings, pay attention to impact sound towards the neighbours.
Renovating a flat in a modern way and saving costs

With smart planning you save noticeably on a flat renovation:

  • All at once: a comprehensive renovation is cheaper than one room a year, because strip-out, protection and coordination are only needed once.
  • Use existing connections: if the kitchen and bathroom stay where they are, installation costs fall.
  • Compare: several comparable quotes show where you get good value for money.
  • Keep what is good: sand the parquet instead of replacing it, swap the fronts instead of a new kitchen.
Checklist for your flat renovation
  • Set goals and budget, with a contingency of around 10 to 15 per cent.
  • In a condominium, check the regulations and inform the management company.
  • In a rented flat, obtain the landlord's written consent.
  • Clarify whether a permit is required if the façade or load-bearing parts are affected.
  • Obtain several comparable quotes.
  • Allow for delivery times for kitchen and bathroom.
  • Inform the neighbours about dates and noisy work.
  • Record handover and warranties in writing.
Christian Vogt, architect

Your flat, soon as good as new.

We view your flat and prepare a quote for you. Free and without obligation.

Request a quote →